工程建设标准英文版
混凝土结构工程施工质量验收规范(英文版) GB 50204-2015 现行
Code for Quality Acceptance of Concrete Structure Construction 收藏

发布日期:2014-12-31

实施日期:2015-09-01

主编部门:Ministry of Housing and Urban-Rural Development of the People's Republic of China

主编单位:China Academy of Building Research

主要起草人:Li Dongbin,Zhang Renyu,Zhang Yuanbo,Gong Jian,Wang Xiaofeng,Zhang Xianlai,Wu Zhaojun,Zhai Chuanming,Wang Yuling,Gao Junyue,Lu Laijun,Zhou Yuenian,Jiang Qinjian,Dai Weiming,Li Xiaoyang,Zhao Wei,Zou Chaoying,Zhou Jianmin,Zhao Yong,Liu Shaoming,Zhang Tongbo,Wu Yachun,Geng Shujiang,Yang Shenwu,Chen Yuexi,Wang Zhenfeng,Wu Jie

出版社:中国建筑工业出版社

标准书号:GB 50204-2015

出版时间:2017-09-01

售价 379.50

Announcement of Publishing the National StandardCode for Quality Acceptance of Concrete Structure Construction

This code is applicable to construction quality acceptance of concrete structure.

No.705

Announcement of Publishing the National StandardCode for Quality Acceptance of Concrete Structure Construction

Code for Quality Acceptance of Concrete Structure Constructionhas been approved as a national standard with serial number of GB 50204-2015,and it shall be implemented from September 1,2015.Herein,Articles 4.1.2,5.2.1,5.2.3,5.5.1,6.2.1,6.3.1,6.4.2,7.2.1 and 7.4.1 are compulsory provisions and must be enforced strictly.The original national standard GB 50204-2002Code for Acceptance of Constructional Quality of Concrete Structuresshall be abolished simultaneously.

Authorized by the Research Institute of Standards and Norms of Ministry of Housing and Urban-Rural Development of the People's Republic of China,this code is published by China Architecture&Building Press.

Ministry of Housing and Urban-Rural Development of the People's Republic of China

December 31,2014

Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China

No.705

Announcement of Publishing the National Standard Code for Quality Acceptance of Concrete Structure Construction

Code for Quality Acceptance of Concrete Structure Construction has been approved as a national standard with serial number of GB 50204-2015,and it shall be implemented from September 1,2015.Herein,Articles 4.1.2,5.2.1,5.2.3,5.5.1,6.2.1,6.3.1,6.4.2,7.2.1 and 7.4.1 are compulsory provisions and must be enforced strictly.The original national standard GB 50204-2002 Code for Acceptance of Constructional Quality of Concrete Structures shall be abolished simultaneously.

Authorized by the Research Institute of Standards and Norms of Ministry of Housing and Urban-Rural Development of the People's Republic of China,this code is published by China Architecture&Building Press.

Ministry of Housing and Urban-Rural Development of the People's Republic of China

December 31,2014

目录

NOTICE

Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China

Foreword

1 General Provisions

2 Terms

3 Basic Requirements

4 Formwork Item Project

4.1 General Requirements

4.2 Formwork Installation

5 Reinforcement Item Project

5.1 General Requirements

5.2 Rebar

5.3 Rebar Fabrication

5.4 Rebar Connection

5.5 Rebar Installation

6 Prestressed Item Project

6.1 General Requirements

6.2 Materials

6.3 Fabrication and Installation

6.4 Tensioning and Detensioning

6.5 Grouting and Anchorage Sealing

7 Concrete Item Project

7.1 General Requirements

7.2 Raw Materials

7.3 Concrete Mixtures

7.4 Concrete Construction

8 Cast-in-situ Structure Item Project

8.1 General Requirements

8.2 Appearance Quality

8.3 Positional and Dimensional Deviation

9 Precast Structure Item Project

9.1 General Requirements

9.2 Precast Members

9.3 Installation and Connection

10 Concrete Structure Sub-part Project

10.1 Entitative Inspection of Structure

10.2 Acceptance of Concrete Structure Sub-part Project

Appendix A Records on Quality Acceptance

Appendix B Inspection on Structural Performance of Flexural Precast Members

B.1 Inspection Requirements

B.2 Inspection Method

Appendix C Strength Inspection on Specimen Cured at the Same Condition of Concrete Structure Entity

Appendix D Inspection on Concrete Strength of Structure Entity with Rebound-core Drilling Method

Appendix E Inspection on Rebar Cover Thickness of Structure Entity

Appendix F Inspection on Positional and Dimensional Deviation of Structure Entity

Explanation of Wording in This Code

List of Quoted Standards

4.1.2 Formwork and support shall be designed according to the installation, service and dismantlingconditions and shall meet the requirements of bearing capacity, rigidity and robustness.

5.2.1 Where rebars approach the site, specimens shall be sampled for yield strength, tensilestrength, elongation, bending properties and weight deviation inspection according to the current national relevant standards, and inspection results shall meet those specified in corresponding standards.

Inspection quantity:determined according to delivered batch and product sampling inspection scheme.

Inspection method:check the quality certificate documents and the sampling inspection reports.

5.2.3 As for the frames and diagonal brace members (including stair flight) designed according toAseismatic Grade Ⅰ, Ⅱ and Ⅲ, the longitudinal rebars thereof shall adopt HRB335E, HRB400E, HRB500E, HRBF335E, HRBF400E or HRBF500E, and its strength and measured value of total elongation under the maximum force shall meet the following requirements:

1 The ratio of the measured tensile strength to the measured yield strength shall not be less than 1.25;

2 The ratio of the measured yield strength to the characteristic yield strength shall not be more than 1.30;

3 The total elongation under the maximum force shall not be less than 9%.

Inspection quantity: determined according to delivered batch and product sampling inspection scheme.

Inspection method:check the sampling inspection reports.

5.5.1 Designation, specification and quantity of rebar to be installed must meet the designrequirements.

Inspection quantity: 100%inspection.

Inspection method: observe, measure with ruler.

6.2.1 Where prestressed tendons approach the site, specimens shall be sampled for tensile strengthand elongation inspection according to the current national relevant standards, and inspection results shall meet those specified in corresponding standards.

Inspection quantity: determined according to the delivered batch and product sampling inspection scheme.

Inspection method:check the quality certificate documents and the sampling inspection reports.

6.3.1 Variety, specification, grade and quantity of prestressed tendons to be installed must meet thedesign requirements.

Inspection quantity: 100%inspection.

Inspection method: observe, measure with ruler.

6.4.2 As for the post-tensioning prestressed structural members, the quantity of steel strands subjected to fracture or slipping out shall notexceed 3%of the total steel strands on the same section, and the quantity of fractured wires in each fractured steel strand shall not exceed one; as for the multi-span two-way continuous slab, the fracture or slipping out quantity on the same section shall be calculated by span.

Inspection quantity: 100%inspection.

Inspection method: observe, and check the tensioning records.

7.2.1 Variety, code number, strength grade, packaging or bulk number and factory delivery date of cement in case of approaching the siteshall be checked, then strength, stability and setting time of such cement shall be inspected, for which the inspection result shall meet the relevant requirements of the current national standard GB 175Common portland cement.

Inspection quantity:at most 200t in bags and 500t in bulk in one lot of cement from the same manufacturer, in the same variety, with the same code number, strength grade and lot number as well as approaching the site continuously.Sampling shall be performed at least once per lot.

Inspection method:check the quality certificate documents and the sampling inspection reports.

7.4.1 Strength grade of the concrete must meet the design requirements.Specimens for inspectingconcrete strength shall be taken randomly at the pouring site.

Inspection quantity: sampling and specimens retaining for the concrete with the same mix proportion shall meet the following requirements.

1 The sampling shall be performed at least once per 100 mixing pot and no greater than 100m of mixed concrete;

2 The sampling shall be performed at least once if the mixed concrete with the same mix proportion per work shift are less than 100 mixing pot;

3 The sampling shall be performed at least once per 200m if the concrete subjected to continuous pouring exceeds 1000m;

4 The sampling shall be carried out at least once for each floor;

5 At least one group of specimens shall be retained for each sampling.

Inspection method:check the construction records and the concrete strength test reports.